Project Case

Other Articles

How to build your own shaker wash plant?

Building your own shaker wash plant involves several steps, each requiring careful planning and execution. Here’s a basic guide to get you started:

Materials and Tools Needed

  1. Metal framing
    • Steel bars, angle iron or tubing for the frame
  2. Screening material
    • Woven wire mesh or perforated steel
  3. Motor and shaker mechanism
    • Electric motor with an eccentric weight or a reciprocating mechanism
  4. Water system
    • Pump, hoses, and spray bars
  5. Plumbing fixtures
    • Pipes and valves
  6. Basic construction tools
    • Welder, cutting tools (grinder, saw), measuring tools, drill, wrenches, etc.

Steps to Build

  1. Design the Plant

    • Plan the dimensions and specifications of your shaker wash plant. Sketch detailed blueprints showing the frame, screen deck, water system, and other components.
  2. Build the Frame

    • Cut the metal framing to size according to your design.
    • Weld the pieces together to form the main structural support of the plant.
    • Ensure the structure is strong enough to handle soil, gravel, and other materials.
  3. Install the Screen Deck

    • Cut the screening material to fit the frame.
    • Attach the screen to the frame, ensuring it is securely fastened but can be removed for maintenance.
  4. Set Up the Shaker Mechanism

    • Mount the electric motor to the frame, ensuring it is securely attached.
    • Connect the eccentric weight or reciprocating mechanism to the motor and the screen deck. This will create the vibration needed to separate materials.
  5. Install the Water System

    • Attach spray bars above the screen deck.
    • Connect the pump to the water source and attach hoses to the spray bars.
    • Ensure the water system is operable and can be easily controlled.
  6. Plumbing and Final Assembly

    • Connect all plumbing fixtures and ensure there are no leaks.
    • Inspect the entire plant for structural integrity and proper operation.
  7. Test Run

    • Turn on the motor and water system to test the plant. Look for any issues with vibration, water flow, or structural stability.
    • Make necessary adjustments to optimize performance.
  8. Usage and Maintenance

    • Regularly inspect your plant for wear and tear.
    • Clean the screens and water system frequently to maintain efficiency.

Safety Considerations

  • Always wear appropriate safety gear including gloves, safety glasses, and ear protection.
  • Be cautious when working with electrical components and machinery.
  • Follow standard welding and cutting safety procedures.

This guide provides a basic framework to build a shaker wash plant. Depending on your specific needs and the materials available, you may need to adjust these steps accordingly. Good luck with your project!