Project Case

Other Articles

100tph tailings copper & zinc process plant

A 100 TPH (tons per hour) tailings copper & zinc process plant focuses on the extraction of copper and zinc from mining tailings. Such a plant utilizes advanced technologies and processes to maximize the recovery of these valuable metals. Here's a brief overview:

  1. Crushing and Grinding:

    • Initial reduction of tailings size through crushers and mills.
    • Ensures efficient liberation of copper and zinc minerals.
  2. Flotation:

    • Tailings are subjected to froth flotation to separate copper and zinc from waste materials.
    • Specific reagents are used to enhance the recovery rate of each metal.
  3. Thickening and Dewatering:

    • Concentrated slurry is thickened to remove excess water.
    • Further dewatering stages may be used to prepare concentrates for smelting.
  4. Concentrate Handling:

    • Filtered concentrates are dried and prepared for transport to smelters.
  5. Waste Management:

    • Proper disposal or repurposing of remaining tailings.
    • Focus on minimizing environmental impact through sustainable practices.
  6. Process Control and Automation:

    • Advanced monitoring systems to ensure optimal operation and recovery rates.
    • Automation helps in maintaining consistent throughput and quality.

If you need specific technical details or further elaboration on any part of the process, please let me know!

Request A Quotation!