2tph rock gold ore mining plant

Sure, here's a sample layout for a 2 tons per hour (tph) rock gold ore mining plant:

2TPH Rock Gold Ore Mining Plant Layout

1. Ore Feeder

  • Type: Vibrating Feeder
  • Function: To evenly and continuously feed lumps of rock gold ore into the crusher.

2. Primary Crusher

  • Type: Jaw Crusher
  • Model: PE-150x250 (depending on actual requirements)
  • Capacity: 1-3 tph
  • Function: To crush large rock gold ore into smaller sizes for further processing.

3. Secondary Crusher (if needed)

  • Type: Hammer Crusher
  • Model: 400x300 or similar
  • Capacity: 1-2 tph
  • Function: Further crush the materials from primary crushing to achieve desired particle size.

4. Ore Grinding Equipment

  • Type: Wet Pan Mill / Ball Mill
  • Model: 900x1800 or 1200 (wet pan mill)
  • Function: To grind the crushed ore to powder form.

5. Concentrator

  • Type: Centrifugal Concentrator / Shaker Table
  • Function: To concentrate the gold from the ground ore.

6. Gold Sluice Box

  • Function: To enhance the recovery rate of the gold concentrate.

7. Thickener

  • Function: To dewater the gold concentrate for easier handling.

8. Smelting Furnace

  • Type: Electric Furnace / Propane Furnace
  • Function: To melt the gold concentrate and pour it into molds.

Additional Equipment and Infrastructure

  • Water Supply System: For milling and concentration processes.
  • Pumping System: To circulate water and slurry.
  • Laboratory Equipment: For assaying and quality control checks.
  • Conveyor Belts: For material handling between different stages.
  • Control Room: For operation monitoring and management.
  • Safety Gear: Essential PPE for workers.

Workflow Overview

  1. Rock gold ore is fed into the vibrating feeder.
  2. The ore is then crushed in the primary jaw crusher.
  3. The output from the jaw crusher is screened for size control.
  4. If needed, secondary crushing is done to reduce particle size further.
  5. The ground ore is processed through the wet pan mill or ball mill.
  6. Concentration is done using a centrifugal concentrator or shaker table.
  7. The gold concentrate is refined using a sluice box.
  8. Dewatering of the concentrate is facilitated by a thickener.
  9. Finally, the concentrated gold is smelted in a furnace to produce gold bars.

This setup should provide a comprehensive, efficient, and cost-effective solution for a 2tph rock gold ore mining plant. Proper customization may be required based on the specific attributes of the mined ore and local regulations.