A 30 tons per hour (tph) zinc and lead process plant is an industrial facility designed for the efficient extraction and processing of zinc and lead ores. Here's an outline of its key components and processes:

  1. Ore Reception:

    • Ore receiving section where raw materials are brought in, typically via trucks or conveyor belts.
  2. Crushing and Screening:

    • Primary and secondary crushers to reduce the size of the ore.
    • Screening equipment to separate ore into various sizes based on requirements.
  3. Grinding:

    • Ball mills or SAG mills to further reduce ore size to a powder-like consistency.
    • Classifiers to separate fine particles from coarser ones.
  4. Flotation:

    • Agitation tanks for mixing crushed ore with water and flotation chemicals.
    • Flotation cells where zinc and lead are separated by specific reagents that make them repel water and attach to air bubbles, allowing them to float and be skimmed off.
  5. Thickening:

    • Thickeners to concentrate the slurry by removing excess water.
  6. Filtering and Drying:

    • Filter presses or vacuum filters to dewater the concentrate.
    • Dryers to remove remaining moisture in the end product.
  7. Smelting (if applicable):

    • Roasting and reduction processes to extract pure zinc and lead from concentrates (though some plants ship concentrates to external smelters).
  8. Tailings Management:

    • Tailings disposal system to handle waste products from the process.
    • Settling ponds or tailings dams for safe storage and environmental protection.
  9. Utility Systems:

    • Water treatment facilities.
    • Power distribution systems.
    • Automation and control systems for process monitoring.
  10. Environmental Controls:

    • Dust collection systems.
    • Gas scrubbing and emission control for environmental compliance.
  11. Storage and Shipping:

    • Stockpiles and warehousing for final products.
    • Loading facilities for transport to markets.

This 30tph plant would involve sophisticated engineering and would be run around the clock to ensure effective processing and recovery of zinc and lead from the ore. Proper maintenance and safety protocols are crucial for smooth operation and risk management.